The Plumbing Division operates similarly to Furniture and other non-Finish divisions, where the Location Name directly corresponds to the Item Type.
Using the Plan View or Room Schedule, you can easily add these locations and assign them to the appropriate Item IDs.
For now, we’ll focus on creating the Locations and assigning the Item IDs using the table below. Adding the Items will be done directly in the Room-by-Room section later.
Here is the Training Module, please use the information below as a reference.
Primary W/C (116)
Location - Type |
Toilet Paper Holder |
Toilet |
Primary Bathroom (118)
Location - Type | Quantity |
Faucet - Lavatory | 2 |
Sink | 2 |
Bath Tub | 1 |
Faucet - Bathtub | 1 |
Towel Bar | 2 |
Robe Hook | 3 |
Primary Shower (115)
Location - Type |
Shower Head - Ceiling Mounted |
Shower Head - Wall Mounted |
Shower Control |
Hand Shower |
Shower Drain |
We now have the Plumbing Schedule Structure built. Next module we will dig deeper into the power of Item ID's and adding information to the Locations. Then in Module 9 we will build out a Interior Finish Room-by-Room.
The Design Process challenges we have addressed in this module.
Schedule Adjustments: Effortlessly make changes to Locations, Item IDs, or Quantities, streamlining the process and minimizing errors. With intuitive tools, you can quickly update details as project needs evolve, ensuring accuracy and saving valuable time.
Topics Covered:
Creating Plumbing Locations
Template Management
Assigning Item ID's
Adjusting Location Item Quantity
Next Module: Design 7 : Item ID's, Locations & Specifications