Design 6 : Plumbing

In this module we will create the Plumbing Schedule Structure.

Updated today

The Plumbing Division operates similarly to Furniture and other non-Finish divisions, where the Location Name directly corresponds to the Item Type.

Using the Plan View or Room Schedule, you can easily add these locations and assign them to the appropriate Item IDs.

For now, we’ll focus on creating the Locations and assigning the Item IDs using the table below. Adding the Items will be done directly in the Room-by-Room section later.

Here is the Training Module, please use the information below as a reference.

Primary W/C (116)

Location - Type

Toilet Paper Holder

Toilet

Primary Bathroom (118)

Location - Type

Quantity

Faucet - Lavatory

2

Sink

2

Bath Tub

1

Faucet - Bathtub

1

Towel Bar

2

Robe Hook

3

Primary Shower (115)

Location - Type

Shower Head - Ceiling Mounted

Shower Head - Wall Mounted

Shower Control

Hand Shower

Shower Drain

We now have the Plumbing Schedule Structure built. Next module we will dig deeper into the power of Item ID's and adding information to the Locations. Then in Module 9 we will build out a Interior Finish Room-by-Room.

The Design Process challenges we have addressed in this module.

  • Schedule Adjustments: Effortlessly make changes to Locations, Item IDs, or Quantities, streamlining the process and minimizing errors. With intuitive tools, you can quickly update details as project needs evolve, ensuring accuracy and saving valuable time.


Topics Covered:

  • Creating Plumbing Locations

  • Template Management

  • Assigning Item ID's

  • Adjusting Location Item Quantity

Did this answer your question?